Chapter 1: introduction

1.1 Generally

1.2 Frame of Work

1.3 Activities of Concretisation of Work

Chapter 2: Technical Description

2.1 Introduction

2.2. Technical and Operational Characteristics of System

2.3 Appreciated Results of Application of System 9

Chapter 3: Analytic Planning of Concretisation of Work

Energies of Implementation of Work

Deliverable: Intermediary Report of Progress of Work of Work A

Deliverable: Intermediary Report of Progress of Work of Work B

4.1 Introduction

4.2 Organisational Form and Clock/Competences of Team of Work

Chapter 5: Requirements of Implementation of Work

Chapter 6: Analysis of Profit and Suspensive Factors of Concretisation of Work

6.1 Introduction

6.2 Operational Profits

6.3 National Profits

6.4 Economic Profits

6.5 Suspensive Factors of Successful Concretisation of Work

 


Chapter 1: Introduction

1.1 Generally

This is a personal estimation for the develop of the system that upgrates old technology mines to SMART MINES.    

 

1.2 Frame of Work

The permanently altered exterior environment, the development of martial techniques and science as well as the requirements of modern field of battle, have created the need for rapid and effective confrontation functional and operational needs of Army on issues research and technology. At the same time, from the make and only that the  mines are also they will remain cheap, functional, easily constructible and important arm specifically with regard to the psychological factor and their effect on the moral of opponent, it is appreciated   that their upgrade constitutes important factor of achievement above and can yield important profits in Armed Forces. Consequently, aim of Work is the upgrade of antitank (A/T) mines of  Army via the growth of microelectronic system of activation A/T mines at the approach tank that will develop the existing A/T mines of old technology that exist in the Army of Land. 

Under designing system will detect the passage of tank or armed vehicles and will activate the mine in suitable distance from this. This system it is possible is adapted in the existing antitank mines of line of M6 and M15 but also in that A/T mines can accept adaptator M1. the system will be autonomous from side of energy. It is judged advisable it is marked that the proposed system is absolutely compatible with the general direction that gives the army of USA in the use of minefields with the use "intelligent" A/T mines, what supports itself in the beginning of "Intelligent Minefields", called as "Intelligent  Minefield   (JMF)", in combination with sensor  arrays or autonomous or included in the electronic circuit of mines.

With the application of system will be sought the transformation of existing A/T mines in  complete width. This will be achieved with the detection seismic and magnetic change but also the noise that causes the tank at his movement. For this aim apart from the electronic system it is possible are used also materials of entrapment that exist in use in the  Army (adaptator M1, common electricity detonator ). The adaptator M1 (which allocates detonator and reinforcing mixture) will repeat the explosive wave (explosion from sympathy) and will transmit with his line this wave in the mine, activating him.                         

The application of system aims at as it helps so as to they are achieved:

The upgrade of obsolete material WAR of land mines with result the increase of fighting force of  Army and Armed Forces more generally

The acquisition of know-how and his possibility of development of system

The strengthening of domestic defensive industry in the sector of microelectronic systems 

1.3 Activities of Concretization of Work

The concretization of Work is described analytically in Capital 3:  Analytic Planning of Concretization of Work   and includes the following activities:

Activity A:  Determination,   at that the experts will determine the type of vehicles, tanks, armed vehicles of battle and transport of personnel that will constitute objectives to destruction as well as the appreciated distance of activation of mine from approaching objective   

Activity B:  Planning,   who includes the in detail planning, by the specifications that will be given and the growth of prototype of appliance of collection of measurements by going through tanks. At the same time, will follow the proportional process for the growth of system of upgrade   

Activity G:  Realization of Study of Financing Analysis of Cost-profit,   which includes the recognition and quantification so much the financing profits that will result from the upgrade of A/T mines what from the saving of other resources (human potential etc), as well as cost that arises from the undertaking in question. 

Activity D:  Control of   developed product, who includes the realization of trials of passage of tanks with the use of appliance of measurements of sensitivity of sensors that will be used for the manufacture of prototypes 

Activity E:  Growth of industrial models, which includes the completion of growth of prototype of appliance of A/T mines with incorporation of all technical data that will result from the previous activity

Activity ST:  Ratification and Certification of final product, which includes the processes of certification of final product   

Chapter 2: Technical Description  

2.1 introduction

  It will be supposed it becomes comprehensible that the drawn final product that is to say the microelectronic appliance of activation of A/T mines   constitute  very evolved  (it uses modern microelectronic technology)  mechanism of entrapment in useA/T mines of  Armed Forces, that is to say main material war of land mines that allocates the country. At the same time, it is judged critical it becomes comprehensible that the by any chance success of common effort for the import of proposed microelectronic system of activation of A/T mines in  Armed Forces  does not change the existing legal or functional operational regime of  utilization of A/T mines (that is to say their way of adaptation, the education of personnel and their in general operational operation).  

However,   the particularity of idea that is attempted it is imported has it makes with the  change of operational characteristics of behavior of minefield. If it is decided is even used the proposed microelectronic mechanism,  as mechanism of entrapment, then  changes automatically the regular use of minefield  (Picture 1). This will happen because the existing A/T mine from simple functioning mine is mechanically changed in modern mine of electronic activated  complete width.  This is the   beginning of operation that is applied in the A/T mines of new generation, at which the mines henceforth lay down  in straight line line because are not required more 6 lines of mines in order to we have successful offence of tank  (Picture 2). 

Picture 1: Formal Regular with  3 arrays with 2 strips of land mines 

 

                      Picture 2: Stratification of mines in a straight line

The use of mechanism that is proposed  is naturally  potential so much for the operator of mine what for the regular governor (that is to say it can if it judges from the characteristics of regular fight it uses or the mines with the use of common mechanic detonator). 

 

2.2. Technical and Operational Characteristics of System

The basic idea is the existing system it only requires the addition of microelectronic system with autonomous source of energy that will be adapted easily in side aperture of entrapment that bring the above types of mines. It might consequently function as simple entrapment of mine but with moreover possibilities without is required the manufacture of new type of mine or other materials (minus the microelectronic system).

The main technical and operational characteristics of system are mentioned flowingly:

 Be a original microelectronic system capable it activates the existing conventional antitank mines of Army of Land, old technology (M6, M15 of American manufacture and all remainder that allocate suitable reception of entrapment) from predetermined distance at the approach of tank.

Be also activated with the pressure that accepts the mine from going through tank of battle or vehicle of heavily type, armed vehicles or fighting armed vechicles.

Is not required the passage of tank precisely above the mine in order to is activated the system, as the case of modern electronic mine ATM 2000E, that functions by the beginning of concave blaster.

The wrapping which will enclose the microelectronic system and the detonator it has biggest protection from the exterior conditions of environment (Military Specifications). 

Is given the possibility of flexible manufacture so on one side is possible their regulation after continuous trials in the fields of exercises, and besides the possibility acquisition of know-how for further technological development of mines of in-depth time.

Is not degraded the explosive mixture of mines and is not required maintenance.

The system it allocates at least three electronic proportional sensors. 

The explosive mechanism it is activated by electric current of low tendency at the approach of tank or vehicle of battle. 

The sensitivity of system it is possible to be predetermined according to the requirements of final user.

The system of upgrade, he is autonomous energy with possibility of detection, with the use of multiple electronic sensors, tank of battle, armed vehicles or fighting armed vehicles or heavy vehicles, from distance and activation of mine of old technology with electronic way. The activation is achieved with the transmission in suitable time (approach of tank in distance that the user has predetermined) electric signal in a common electricity of detonator  destructions which with his line transmits the explosive wave in adaptator M1 that him repeats (explosion from sympathy) and transmits with his line the explosive wave in the mine, activating him. Adaptator M1, material of American manufacture is in wide use from the  Army and allocates detonator and reinforcing mixture.

The adaptation of electronic system it becomes in side apenture of entrapment that bring the above types of mines.

Exclude the possibility of activation of mine (minus case of entrapment) from human factor. This probability is today real with the existing conventional mechanism of pressure to activate of existing A/T mines is required pressure of 200 Libra i.e. 90 roughly kilos. The combination of sensors that allocates the system in order to activated, by the parameters of planning, it is not possible to be caused from person or animal. This logic keeps pace with that of European Union that the last years makes efforts are decreased the accidents in human potential from the use of mines for the use of which prevails a generally negative spirit. 

Exists the possibility of placement two and three mines in the same place so if it becomes placement is in-depth achieved explosion from sympathy with a electronic functioning mechanism.

Is possible the maintenance of existing mechanic operation of mine in combination with the proposed electronics (double way of activation). Also exist the possibility of re-activate's  it (so much engineer of what electronic mechanism of activation). 

 

2.3 Appreciated Results of System Application

Certain of the appreciated results of application of proposed system of upgrade are mentioned followingly:

 Are changed the A/T mines of old technology in modern  complete width. In this way is developed and rendered material modern and operational most reliable. At the same time, is minimized the danger that exists  from cause of age of A/T mines and long gone technology that they use 

Is economized precious specialized personnel of layer of mines because the mines it is possible they are set henceforth in a line per 4 roughly meters, (3,6 width of medium tank and 0,20 m minimal appreciated distance of loss-making distance from the tank), distance between them. Is passed the obsolete standardized way of layer of NATO that requires the 3 mine stripes, two mine arrays each that it requires personal 32 soldiers in order to exists successful result.

Is economized precious time in the field of battle.

The layer of A/T mines because simplicity can become also from not specialized personnel of engineer. 
 

Chapter 3: Analytic Planning of Work Concretization 

The concretization of Work is appreciated that it can last globally about 18 months from the beginning of the program. the work of concretization of Work they are:

 Deposit of argued proposal of upgrade of A/T mines in  Armed Forces. 

Growth, from the Team of Researchers, appliance of measurements of sensitivity of sensors that will be used for the manufacture of prototypes.  

At the same time with the above energies the Team of Researchers will advance in the following work: 

o              It will draw and it develops the institution (nutshell) in which will be placed the all microelectronic system, the energy source and electric detonator , and will be adapted the mechanism of reinforcing blaster of detonating of A/T mines of manufacture USA.

o             It will certify the minimal strong tendency in volts and intensity in (ampere) which applied in utmost the electric detonator him it activates.    

o             It will also examine the possibility of supply from who institution of above electric detonators and reinforcing blasters detonating of A/T mines.

o             It will ensure and it will determine in collaboration with the Team of Work of financier the suitable space, time and tanks of battle for passages near the appliance of measurements of sensitivity of sensors so that is fixed the electronic signature of going through tank. 

 Activation, from the Team of Researchers, number A/T mines (without the use of prototypes electronic activators of mines) with his attendance GROUNDS for the determination of that minimal distance between A/T of mine and tank that will be fixed as loss-making for the tank of battle. Realization, from the Team of Researchers, trials of passage of tanks with the use of appliance of measurements of sensitivity of sensors that will be used for the manufacture of prototypes. 

Growth, from the Team of Researchers, prototype of microelectronic appliance of upgrade of A/T mines of (proportionally requested prototypes). 

Completion, from the Team of Researchers, growth of prototype of appliance of activation of A/T mines (number original) with incorporation of all technical data that will result from the trials in the field.

Certification, from the Team of backer, the prototype of appliance of activation of A/T mines in determined number of prototypes. 

Realization, from the Team of backer, the processes of certification of final product.

Growth, from the Team of Researchers, industrial model of (final product) prototype of appliance of activation of A/T mines.  

Beginning of trials, from the Team of backer, for the certification of industrial model of (final product) prototype of appliance of activation of A/T mines. 

Realization, from the Team of Researchers, Study of Analysis of Financing Cost-profit, aiming at the recognition and quantification so much financing profits that will result from the upgrade of mines what from the saving of other resources (human potential etc), as well as the determination of cost that arises from the undertaking in question.

Management, from the Director of Work in collaboration with the association group, the total work aiming at the co-ordination of energies of concretization so as to are ensured the desirable result and the work of be materialized in the frame that is worked out by the offer and the relative timetable. Besides, continuous follow-up of his concretization and effective confrontation of questions and difficulties that probably result.  

In the tables that follow they are described the timetable of concretization of Work and deliverable that will be drawn up:

 

Energies of Implementation of Work

  Time

Acceptance of Proposal and Beginning of Study

H0

 

  Growth of appliance of measurements of sensitivity of sensors that will be used for the manufacture of models

  H0+6

Deliverable: Technical Study of Appliance of Measurement of Sensitivity of Sensors

  H0+2

Planning and growth of institution of hemming electric detonator and adaptation of mechanism of reinforcing blaster of detonating of A/T 

  H0+9

  Certification of minimal possible tendency and intensity of sure activation of electric detonator

  H0+3

  Examination of possibility of supply and source of supply of electric detonators and reinforcing blasters detonating A/T mines of manufacture USA

H0+3

 

Guarantee of space and tanks of battle for determination of prices of sensitivity of sensors of appliance of measurement

H0+2

 

Activation of number of mines and determination of beam of action

H0+3

Measurement of sensitivity of sensors, determination of prices (passage of tanks)

  H0+4

Deliverable: Appliance of Measurement of Sensitivity of Sensors

H0+6

 

  Growth of prototype of appliance of upgrade A/T mines

H0+9

Incorporation of results from trials of field

H0+10

Deliverable: Technical Study of Growth and Specifications of Prototype of Appliance of Upgrade A/T of Mines

H0+6

 

  Acceptance of Specifications from GROUNDS

  H0+7

 Certification of prototype of appliance of activation of mines

H0+11

Deliverable: System of Upgrade A/T of Mines (Laboratorial prototype)

  H0+13

Realization of Study of Analysis of Financing Cost-profit

H0+13

 

Growth of industrial prototype (final product)

H0+17

 

Certification of industrial prototype (final product)

H0+18

  Deliverable: Study of Analysis of Financing Cost-profit

H0+17

 

Deliverable: Industrial prototype (final product)

H0+18

 

  Management and Follow-up of Implementation of Work

  H0+18

Deliverable: Initial Report of Progress of Work of Work

H0+3

 

  Deliverable: Intermediary Report of Progress of Work of Work A

H0+8

 

Deliverable :Intermediary Report of Progress of Work of Work B

  H0+13

Deliverable: Report of Finalization of Work

H0+18

 


 

Chapter 4: Organization and Composition of Team of Work

4.1 introduction

The organization and composition of Team of Work will be supposed to cover the needs of work so much in thematic specializations of executives what in level of experience so as to she is ensured smooth, unhindered and according to his requirements concretization. Simultaneously, is required the explicit delimitation of roles and responsibilities in a flexible but effective system of administration and communication with the customer so that is created the base for the biggest possible attribution of Team. 

With base more, the organization and composition of Team of Work were shaped with base the following parameters:  

 Cover with the most optimal possible way of criterion of sufficiency of experience in the benefit of completed services. 

Complete cover of increased specialized technical requirements of Work.

Effective organization and operation of Team. 


 

4.2 Organizational Form and Clock/Competences of Team of Work

Director of Work

The Director of Work leads the work, has the responsibility of implementation and general monitoring of this and finds itself in direct communication and contact with the association group of backer. The role of Director of Work includes:

 Representation of Contractor opposite of the financier.

Guarantee of communication and collaboration with the association group/backer

Responsibility of total planning, direction and qualitative control of work

Follow-up of relative progress of work and phases of concretization of Work

Briefing of association group on the course of Work, needs in and resources and generally on all the subjects that are connected with the provided from the Contractor services  .   

Team of Researchers

The role of Team of Researchers includes:

 In collaboration with GROUNDS it will attend in the work of  activation of number A/T mines  (without the use of original electronic activators of mines), for the determination of that minimal distance between A/T of mine and tank  that will be fixed as loss-making for the tank of battle and will be henceforth the  beam of action of A/T of mine when it is used with electronic mechanism of activation. It will draw and it in develops the  institution in which will be placed the microelectronic system, electric detonator , and will be adapted the mechanism of reinforcing blaster of detonating of A/T mines. 

It will certify the  minimal strong tendency in volts and intensity in ampere which applied in utmost the electric detonator activates certainly. 

It will also examine the possibility of supply from who institution of above electric detonators and reinforcing blasters detonating of A/T mines.  

It will draw the appliance for the  reception of measurements of  prices of sensors that will be used in the final product.

Constructs number of original microelectronic appliances of activation of A/T mines.

It will shape the final product, i.e. the microelectronic system of activation of A/T mines.

Potential as final product it can be shaped the appliance for the reception of measurements of number of sensors for further localization of traces of concrete tanks, vehicles of two-wheeled etc means that they go through from minefield or other space. However, for this appliance it will be supposed becomes special agreement with  Armed Forces, because growth is henceforth laborious in time, knowledge and money that all the system of activation of A/T mines. This will also be in effect in the case at which it is asked by Armed Forces distant (remote) activation and re-activate of mine or growth and incorporation of system recognition. 

Will be held Study of Analysis of Financing Cost-profit

Team of Work financier

The role of Team of backers is the collaboration with the Team of Researchers for the facilitation of concretization of activities.
 

Chapter 5: Requirements of Implementation of Work

For the successful completion of Work are judged important the contribution and collaboration of executives of association team in the following indicative sectors:

 In the determination by experts of  Army of type of vehicles, tanks, armed vehicles of battle and transport of personnel that will constitute objectives to destruction. 

In the determination and determination of distance of activation of mine from the approaching objective, so as to are satisfied the operational needs of  Army.

In the discovery and benefit of means, (tank or armed vehicles), human potential and spaces where will be realized the adjust of sensors of system that is to say the calculation of sensitivity for certain distances at the approach of tank or vehicle or armed vehicles or fitting armed vehicles.        

In the determination of desirable way of re-activates of system.

In the determination of required continuous time interval for which the user wishes functions the system.

In the determination of minimal sure tendency and intensity of electric current which activates a common detonator. This can be also realized with trial in the field of exercises.   

More specifically with regard to in the education and in the use of new systems and so the final product constitutes a functional and functional tool in the sector of mine war for  Armed Forces, is appreciated that the final products will be supposed to fill the following characteristics:

 Be developed in two levels where in the 1st level will be realized the education of instructors of system and in the 2nd level the education of users.

Be as possible more acceptable and comprehensible from the side of so much instructors what educated. Be friendlily to the user with regard to in their way of operation.
 

Chapter 6:

Analysis of Profit and Suspensive Factors of Work Concretization

6.1 introduction

The profits that are expected they result for  Armed Forces from the concretization of Program of Upgrade of A/T mines , are mainly Operational, National but also Economically. However, it is judged necessary are reported also the likely suspense factors of successful concretization of Work.   

6.2 Operational Profits

With the application of program of Upgrade of A/T of mines, it is judged that they might be exported critical conclusions which will lend important help in the improvement of operational readiness. Certain most important operational subjects which will be appeared by the concretization of Work are:

 The effectiveness of A/T of their mines with regard to in distraction on the objectives of  – threats, that in general lines are same or have the himself or similarly operational behavior with in use tanks. 

Beyond the any quantification of parameters, the comprehension of mechanism of destruction of objectives, will contribute considerably in the export of useful conclusions with regard to in the application of attempted upgrade old this material mine war. At the same time, will be exported critical conclusions with regard to in the relative restriction of material or even his withdrawal make which will have as result the reject of pointless work of maintenance and education. The acquisition of experience and knowledge for the further planning with regard to in the materials mine war and in the essential support of these of in-depth time with as long as the possible lower cost.

6.3 National Profits  

 The growth and application of microelectronic system of upgrade of A/T mines will lend additional national profit for the reasons that are described followingly:  Will be acquired the know-how providing the possibility of development of this systems and their continuous improvement after the observations of executives that will be pointed out in the fields of exercises. Will be given the possibility of promotion of defensive domestic industry specifically in the sector of microelectronic systems.

Will be created new places of work with direct favorable effect in the indicators of unemployment of country.

Will be achieved elevation of defensive national level.

Will be acquired self-sufficiency in microelectronic defensive systems.

Will be acquired precious experiences as result of effort of upgrade of old defensive system.

6.4 Economic Profits

The economic profits it is forecasted they result from the saving natural and human resources as well as other means than the application of microelectronic system of upgrade of A/T mines. The precise extent will be determined by the Study of "Analysis of Financing Cost-profit" that will be held at the duration of concretization of Work.

 6.5 Suspensive Factors of Successful Concretization of Work

For the successful concretization of Work it is judged important are taken into consideration certain factors which can lead to delays of concretization of Work. The basic suspense factors which are visible are: 

 Overshooting of time limits of present planning.

Not creation of desirable extent of destructions on the tank of objective, accordingly always with the one that will determine experts of  Army concerning the distance that the himself will determine as minimal loss-making beam of action.

Dangers of overshooting by the technology, because delay in the growth of program.

Concretely, for the reject of delay of program of concretization of Work it is judged essential, at the Phase of Planning, it becomes explicit from side of  Armed Forces  what precisely is the "vulnerability of tank or vehicle" that is caused from existing A/T mine that is to be upgraded. In this subject it should is given particular importance as the knowledge for their drastic faculty it emanates from their other sources and mainly from suppliers of USA from which is not easy the briefing with regard to the weaknesses that they present.

Consequently, what should it becomes explicit is that the action of mine it has it makes with caterpillar tractor of the tank, when this goes through above the mine and with her weight fire the mine. Since no-one other mechanism is activated (eg time delay) the mine explodes immediately and it destroys caterpillar tractor the tank, which is rendered vulnerable in all the fires because static henceforth. We do not know in the present phase, what other damage befalls in the affected from the mine tank (eg death of personal tank, destruction of also other vital sub systems of tank, likely inversion of tank etc).

Taking into consideration this important subject, is judged essential his representatives GROUNDS, (fixed as experts in the phases of certifications), us they inform, what the use of A/T of mine involves  as damage in the tank (a lot more in the modern tanks that allocate many mechanisms of self-protection). This process perhaps leads to the need of specification of requirements of vulnerability of tank where nor mechanically I functioned the mine it achieves. The resolution of problem will be exceeded after she becomes  STATIC  (tank in attitude of mine from big distance) detonation of mine in tank which is in disuse.   

The results of  Static detonation  are considered very important as they fix a line from critical questions for the final product.   Concretely, will be determined the distance in which we will have loss-making results for the tank that it goes through, which will be for the final product his beam of action. 

Consequently in this phase will be essential the attendance of his executives GROUNDS as those it is that will determine the specifications in the subject of vulnerability of tank. This means that if in eg 70 the cm mine destroys the caterpillar tractorand immobilizes tank and GROUNDS  it accepts that this damage is satisfactory for the tank,  then is not essential the mine that brings the new microelectronic mechanism to have the same results of vulnerability with same that bring mechanically functioning mechanism (this will happen because with the use of microelectronic mechanism seeks the in distance from the tank explosion of mine). With this way changes also her regular utilization in the field of battle in order that it has also before it is reported. The pointing out becomes because probably the trials they show that the tank that goes through above the exploding mine it still has also other damage or exists big probability is affected the personnel that serves the tank. Also does not exist known world precedent for such effort of upgrade of such mines and it is repeated that it will be undertaking of inquiring initiative in world climates.    If they are certified in the field of trials more, it could claim no one that with the way this (use of microelectronic technology in detonation A/T mines)  it is not attempted is only murdered the personnel of tank but  to be placed except operation. 

Taking into consideration it is more judged important it is marked that the above likely disadvantage that will be presented by the use of mine that will bring microelectronic technology detonating mechanism can be reversed an advantage (with regard to the concretization of proposal) for the following reason. If somebody wants it buys a modern mine as the case of mine ATM 2000E (Picture 3) which requires passage of tank precisely above the mine in order to is activated the system it is in danger it is accused that it seeks the death of all payment of tank. Indeed because the above mine uses concave explosive mixture it creates small apenture in the tank and it channels all the explosive wave in the tank with the above results. Of course with the use of proposed system does not exist such danger for the payment of tank.  

Πλαίσιο κειμένου:

 

 

 

 

 

 


 

                      Picture 3: Use of Mine of Type ATM 2000E  

 

In no other case does not emerge venturousness in the all program because the Company CAPE and the Team of Researchers allocate the proportional infrastructure and the essential know-how.  

Summarizing we judge important it is marked that the concretization of Work we consider, that it constitutes, a important for Armed Forces occasion to improve her defensive level importing modern technologies.  

      see  also  :  MITOS2.HTM

 

 

patents :

 

http://worldwide.espacenet.com/publicationDetails/biblio?CC=GR&NR=1004442&KC=&FT=E&locale=en_EP

 

 

 

   Copyright © cgri  Ltd     All rights reserved       Mozila Firefox oriented design      Terms & conditions to use this web site